Engineering study carried out by Creative engineering service concluded that the most efficient solution for transportation and Installation of Cantilever beam for offshore RIG by using SPMT.
Creative has provided detail step by step methodologist to Installation the Cantilever beam on to the offshore rig by realising partly load from the SPMT which allow to reposition the second set of SPMT to complete Installation procedure.
Weight of the Cantilever was 1200 Te and Dimension was 19.7m x 32.3m