Project

Method statement and Risk assessment of Crawler crane assembly 

Project

Assembly of Crawler Cranes

Location

Indonesia

Load Detail

Cranes : Liebherr LR 13000, Terex/Demag CC2400-1, Sannebogen 5500, Kobelco CKE2500

Scope of work

Provide Method statement and Risk assessment of Crawler crane assembly

Detail of Work

We are privileged to support our client with our experienced to providing detailed method statement for assembly of the crawler crane Including step by step drawings and Risk assessment.

Initially we have asked to provide detail assembly procedure only for Liebherr LR 13000 (3,000 Te) crawler crane and later we have been asked to provide same for another 7 cranes. Including Liebherr LR 1250, Terex/Demag CC2400-1, Sannebogen 5500 & Kobelco CKE2500
Shopping Basket